• Help Center

Shipping line · SCAC SFTU

Safetrans Line container tracking

Track Safetrans Line containers, bills of lading and bookings with every terminal event, vessel and updated ETA.

Safetrans Line Limited

Directory data
SCAC
SFTU
Tracks by
ContainerB/LBooking
Type
Shipping line
Alliance
Independent
Website
safetransline.com

Safetrans Line Container Tracking Example

Our container tracker lets you monitor shipment progress, including its current location, ETA, and route history, and receive real-time notifications along the way.

SFTU9070320

LOAD
B/L 254810936

Last updated: 24 Sep, 22:35

Port of LoadingPort of Discharge
Ningbo, CNNGBRotterdam, NLRTM
ATD 12 Aug, 2025 ETA 30 Sep, 2025

Container Tracking Timeline

  1. Yangon, MM Empty to Shipper26 Jul 2026, 00:00
  2. Yangon, MM Export received at CY27 Jul 2026, 00:00
  3. Yangon, MM Full Transshipment Loaded28 Jul 2026, 00:00
  4. Singapore, SG Full Transshipment Discharged03 Aug 2026, 00:00
  5. Singapore, SG Full Transshipment Positioned Out05 Aug 2026, 00:00

Freight Rates with Safetrans Line

Indicative ocean rate on one of Safetrans Line's main lanes. Open the Freight Calculator to compare rates for your own route.

Safetrans Line
Valid to: 28/11/202640'HS20 days
Ningbo PortRotterdam Port

Example rate for the demo

Safetrans Line Tracking Number Formats

Where to find each number and what it looks like.

NumberFormatExampleWhere to find it
Container4 letters + 7 digits (ISO 6346)SFTU9070320On the container doors, the B/L and the packing list
Bill of ladingCarrier-specific, often with the SCAC in frontSFTU…Top right of the B/L; also in the arrival notice
BookingCarrier-specific—Booking confirmation from the carrier or forwarder

Safetrans Line Container Tracking Statuses Explained

Event names as the carrier shows them, in plain words.

  • GATE-OUT EMPTY

    Empty box released from the depot to the shipper for loading.

  • GATE-IN

    Loaded box received at the export terminal.

  • LOAD

    Box loaded onto the named vessel and voyage.

  • DEPARTURE

    Vessel left the port. Next event is at the hub or destination.

  • DISCHARGE

    Box lifted off the vessel at a hub or at the port of discharge.

  • GATE-OUT

    Box left the terminal to the consignee. Detention starts counting.

  • GATE-IN EMPTY

    Empty box returned to the depot. The trip is complete.

  • CUSTOMS HOLD

    Box held for inspection or missing documents. Contact your broker.

About Safetrans Line tracking

Safetrans Line is an ocean shipping line with SCAC SFTU.

Paste the number in the form above. Container numbers are checked as you type, so a typo shows up before you search.

Safetrans container tracking

"Does it go straight to St Petersburg or does it stop somewhere first?" is the question we get most about Safetrans.

Depends which loop you're on, honestly. The Bronka terminal in St Petersburg announced its connection with Safetrans Line in February 2023 - that's when the line came onto China to Russia - and the service has since gone by the name St Petersburg Direct. Qingdao, Shanghai and Ningbo, then Nansha, and on some sailings a call at Tangier before the long haul up to the Baltic. So "direct" mostly means your box isn't transshipped, not that the ship skips every port. Safetrans also runs from China to Vietnam, Thailand, Indonesia and Turkey, and on some of the Russian sailings it has worked with OVP Shipping, so don't be surprised if the vessel name on your screen isn't one you'd connect with the brand.

You'll see all of that in Safetrans container tracking. Put a number in (the carrier is already set on this page) and you get the status, the vessel it's on now, the events and an ETA, plus the ship on a map. The map is the bit of Safetrans line tracking I'd actually open once a week, because it shows whether the ship is where the schedule says or still somewhere off Morocco.

Three kinds of numbers work. The container number is the usual one, letters plus seven digits, taken from the door of the box or from the packing list. The bill of lading number shows every container on that B/L together, good for anyone with a mixed shipment split over several units. And before the cargo is loaded, a booking number often gets you the first events - empty released, gate-in at the port of loading. If one number comes up blank in Safetrans tracking, try another. The first day or two after loading can be patchy.

The timeline is the plain sequence, gated in and loaded, off it goes, a port call or two if the loop has them, and then discharge in St Petersburg, out of the gate and the empty back. Each with a date and a place. Every time the ETA moves you get a notification. On this lane that's more often than anyone would like, and the reason is usually dull - a slow berth at the far end, or the ship sitting a day off Tangier because the slot isn't ready.

At the Russian end Safetrans cargo tracking is what tells you when to get going on customs. It's not the kind of declaration you want to put together on the morning of discharge, and once the box is off the ship the terminal starts charging storage anyway. A rough rule some people use is to start the paperwork when the vessel goes through the Danish straits. If somebody else is the consignee, give them the B/L number and let them do their own Safetrans shipment tracking.

One more name you might run into. Sea Legend, which runs Arctic sailings from China to Europe, has been described as an affiliate of Safetrans Line, but it's a separate service with its own numbers. A forwarder mixing the two up in an email happens.

No events for days, or a box parked on "discharged" with no gate-out? Ask the line or whoever booked it, since Safetrans container tracking only knows what the carrier and the terminals report.

The Baltic in winter adds a few days. Plan for them.

FAQ

What should I check before searching for a Safetrans Line container?

Have the full shipment reference ready and check which number types the form supports for Safetrans Line. Compare the reference with the shipping document rather than retyping it from memory. Make sure you are searching under the company responsible for the shipment.

Why is my Safetrans Line tracking number not recognised?

A typing error, an unsupported reference type or a record that is not yet available can prevent a match. Check the complete number and the Safetrans Line carrier selection. If it still fails, ask your shipper to confirm the transport reference and current shipment details.

Can I identify Safetrans Line from the letters in a container number?

The prefix of a standard container number identifies its registered owner or principal operator, not necessarily the carrier transporting it on a particular voyage. Confirm Safetrans Line from your booking or shipping documents rather than relying on the prefix alone.

Why has Safetrans Line tracking not changed for several days?

Tracking is often milestone-based, so there may be no new event between port calls or while a container awaits its next movement. Check the latest available date and expected next stage. If your Safetrans Line shipment appears overdue, ask the booking party for an operational update.

Does no Safetrans Line tracking result mean the container is lost?

No. A missing search result does not establish that cargo is lost. First verify the reference, responsible carrier and whether the shipment record is available. If you still cannot locate your Safetrans Line shipment, contact the shipper or forwarder with the original booking details.

What details should I provide when asking about Safetrans Line tracking?

Provide the shipment reference, container number if known, origin and destination, and the latest event or error you can see. Keep the booking confirmation or bill of lading available. This helps the party handling your Safetrans Line shipment investigate the specific record.

All Carriers A–Z

Every shipping line and NVOCC on Globy, A to Z.