• Help Center

NVOCC · forwarder · SCAC BLZU

BLZU

BLPL Singapore container tracking

Track BLPL Singapore containers, bills of lading and bookings with every terminal event, vessel and updated ETA.

BLPL Singapore Pte. Ltd.

Directory data
SCAC
BLZU
Box prefixes
BLZU
Tracks by
ContainerB/LBooking
Type
NVOCC / forwarder
Headquarters
Singapore, Singapore

BLPL Singapore Container Tracking Example

Our container tracker lets you monitor shipment progress, including its current location, ETA, and route history, and receive real-time notifications along the way.

BLZU9070321

LOAD
B/L 254810936

Last updated: 24 Sep, 22:35

Port of LoadingPort of Discharge
Ningbo, CNNGBRotterdam, NLRTM
ATD 12 Aug, 2025 ETA 30 Sep, 2025

Container Tracking Timeline

  1. Yangon, MM Empty to Shipper26 Jul 2026, 00:00
  2. Yangon, MM Export received at CY27 Jul 2026, 00:00
  3. Yangon, MM Full Transshipment Loaded28 Jul 2026, 00:00
  4. Singapore, SG Full Transshipment Discharged03 Aug 2026, 00:00
  5. Singapore, SG Full Transshipment Positioned Out05 Aug 2026, 00:00

Freight Rates with BLPL Singapore

Indicative ocean rate on one of BLPL Singapore's main lanes. Open the Freight Calculator to compare rates for your own route.

BLPL Singapore
Valid to: 28/11/202640'HS20 days
Ningbo PortRotterdam Port

Example rate for the demo

BLPL Singapore Tracking Number Formats

Where to find each number and what it looks like.

NumberFormatExampleWhere to find it
Container4 letters + 7 digits (ISO 6346)BLZU9070321On the container doors, the B/L and the packing list
Bill of ladingCarrier-specific, often with the SCAC in frontBLZU…Top right of the B/L; also in the arrival notice
BookingCarrier-specific—Booking confirmation from the carrier or forwarder

BLPL Singapore Container Tracking Statuses Explained

Event names as the carrier shows them, in plain words.

  • GATE-OUT EMPTY

    Empty box released from the depot to the shipper for loading.

  • GATE-IN

    Loaded box received at the export terminal.

  • LOAD

    Box loaded onto the named vessel and voyage.

  • DEPARTURE

    Vessel left the port. Next event is at the hub or destination.

  • DISCHARGE

    Box lifted off the vessel at a hub or at the port of discharge.

  • GATE-OUT

    Box left the terminal to the consignee. Detention starts counting.

  • GATE-IN EMPTY

    Empty box returned to the depot. The trip is complete.

  • CUSTOMS HOLD

    Box held for inspection or missing documents. Contact your broker.

About BLPL Singapore tracking

BLPL Singapore is a forwarder (NVOCC) that issues its own bills of lading, SCAC BLZU.

Paste the number in the form above. Container numbers are checked as you type, so a typo shows up before you search.

BLPL container tracking

A box headed for Haldia rarely goes there in one hop, and that's the first thing to understand about BLPL.

BLPL Singapore is a Transworld Group company, and its network has always leaned on hubs. Back in 2012 it started two weekly services out of Singapore and Port Klang, one running to Yangon and one to Kolkata, Haldia and Paradip on India's east coast (those ports feed cargo up into northeast India and on to Nepal and Bhutan). The same year it went from being an NVO, booking slots on other people's ships, to running its own tonnage. So depending on the lane and the year, your container may sit on a BLPL vessel or on a partner's, and the name in the vessel field won't always match the name on your paperwork. Normal.

For BLPL container tracking on Globy you put in a number, the carrier is already set on this page, and you get the status, the vessel, the event list and an ETA. Container number, bill of lading or booking number all work. The container number is the usual four letters plus seven digits. The B/L is handy when one document covers several boxes and you'd like to see all of them in one go, and the booking is what you have before anything has been loaded. If a fresh booking shows nothing, give it a day - the carrier sometimes links boxes to it late.

What a typical timeline looks like here is gate-in at the origin terminal, loaded, then the part people care about - discharge in Port Klang or Singapore, a few days waiting for the connecting vessel, loaded again, then discharge at destination and gate-out. Each event has a place and a date. If the transshipment stop stretches, you'll see it as a gap between "discharged" and the next "loaded", and that gap is usually the honest answer to why the ETA slipped. The vessel position shows up on the map too, so you can see whether the ship is already in the Bay of Bengal or still alongside in Malaysia.

ETAs move. The screen refreshes them as new data comes in and you get a notification when the date changes. BLPL tracking needs no special software, a browser does it.

A few practical notes for importers. Hold the truck until the box is actually discharged, "arriving" means very little. Indian east coast ports can get congested around the monsoon months and a vessel can wait outside for days, so a planned delivery date in July is worth treating loosely. Have the customs broker start on the bill of entry before arrival, and check the free days for demurrage and detention on your B/L, they differ by port. BLPL cargo tracking also helps when the consignee keeps phoning to ask - you can just send them the status.

Sometimes BLPL shipment tracking shows the same event for a week. The data comes from what the carrier and terminals report, so a frozen status usually means nobody has reported anything new yet, not that the box vanished. If it bothers you, the BLPL office or your forwarder can check it with the terminal. Most of the time a second BLPL container tracking check a day later already shows the next move. Patience is often all it takes to track a BLPL container across two hubs.

FAQ

How can I follow a BLPL Singapore container through transshipment?

Search the shipment reference and read the events at each intermediate port in date order. A connecting journey can involve discharge, waiting, loading onto another vessel and a new departure. Check the destination attached to your BLPL Singapore shipment before interpreting an intermediate arrival as the final one.

Which reference should I use for a BLPL Singapore shipment with several sea legs?

Use a reference accepted by the BLPL Singapore tracking form. An individual container number is useful for checking that box across reported movements. If you have only a forwarder-issued reference, ask the forwarder which number identifies the shipment in the carrier's tracking records.

Why is my BLPL Singapore container at a port that is not the destination?

The port may be a planned transshipment stop or another point on the booked route. Compare the event location with the routing in your shipping documents. If the movement does not match your expectations, ask the company handling the BLPL Singapore booking to confirm the route.

Does discharge at a transshipment port finish my BLPL Singapore shipment?

No. At a transshipment port, discharge is an intermediate step before the next vessel leg. Look for the connecting loading or departure event when it becomes available. The final destination remains the one specified for your BLPL Singapore shipment, unless the booking has been amended.

Which arrival estimate should I use for a BLPL Singapore journey with a connection?

Use the estimate attached to the destination you are planning for, not an intermediate port ETA. A BLPL Singapore shipment can have several arrival dates for different legs. Check the location and latest available update before using an estimate for onward transport planning.

Why is there no new BLPL Singapore event during a connection?

A container may be waiting for the next movement, or the next event may not yet have been reported. A quiet tracking timeline does not by itself explain the cause. If your BLPL Singapore connection appears overdue, request the current vessel assignment and expected departure from the booking party.

All Carriers A–Z

Every shipping line and NVOCC on Globy, A to Z.